*** Little Update *** Date March 09, 2009
Weather held out slightly yesterday morning so got the buggy wheeled out of the garage and started stripping bits that are no longer needed. Pictures don't show much but i have added a few anyway.
Got the old pedal box removed and have ripped out all the old break lines and clutch line as i was not happy with how these where done.
Removed the exhaust system as this needs to be completely remade for the new engine, have kept the crabon fibre bike can though as it should sound great with the starlet engine.
Started looking at relocating the battery to make way for the front mounted radiator.
Ripped the rest of the stuff out that i could from the passenger compartment and gave the car a well deserved clean up.......before the rain started.
Next weekend the old mini engne will be out and i will begin modifying the rear light units and sorting out dash panels and some of the wiring.
Exhaust and engine pieces removed......

Back to start on the inside of the buggy.

Hopefully Stage 1 will be underway officially at the end of April, although im waiting to hear from James to confirm exact days ::)
Thats ya lot for now!
Jason
*** Update Time *** March 14, 2009
Yesterday i ordered up the Aluminium composite sheet thats going to make up the main panels of the car (sides, rear firewall, front panels, engine cover parts etc). Got 1500x3000mm sheet in Matt black, stealth
Today i got confirmation from James @ ToyotaGT that the stalet is now booked in for end of April to be dissmantled, seems like ages away but im broke until then so no choice really! Can't wait for this to start now!!!
Also managed to get the buggy out of the garage and got the old mini engine out of her so now have a blank canvas.


My bro was shocked at how light the car really is

Blank canvas......not for long


Here is a few of me sat in the car, can't wait for it to be done.........long way off though!


Got the old engine packaged up, now waiting to go to its new owner

Hopefully will be getting on with removing front bumper and getting templates made up for panels tomorrow
Jason
*** Little Update *** Date March 15, 2009
Got a little more done today, Sarah is working the next 3 weekends in a row so have plenty of time to get few bits done here and there!
Firstly i got the front bumper bar removed as this is now getting sold as i will be making a new custom front piece.

Test fitted the Chequer plate front piece i have, really like the look of it but i have already sold it as will be having the radiator up front and this will be useless as it will stop the air getting to it.

Got the Mini pedal box dismantled as this will need some parts keeping for the new pendulum pedal box im making up

Had some trouble with the universal joints on the steering so spent a while sorting this out but got there in the end!
Then spent the remander of the day getting all the old mini parts together and they are now ready to go to there new owner
Also had a little look to see what two seats look like in the car using the two racings seats i just happen to have lying about

Hopefully during the week i will get the new side panels made up and rear firewall made. Then test fitting and dash board work will be next weekend.
Jason
*** Update *** Date March 22, 2009
Been one of those weekends, managed to snap the only M4 tap i had yesterday so had to go and buy a new tap and die set! Then kept snapping drill bits which kept anoying me, got there in the end though. Would have liked to get more done this weekend but at least i managed to get some things done i guess!
Im now working easter weekend, well im on call if anything goes wrong. My boss says i can work on the buggy at work and then just fix things if anything goes wrong but spend most of the day working on the car! They have mig welding gear at work so im going to start looking at welding up the pedal box and a few other bits that need doing soon!
Monday this turned up at work, Matt black Composite panel that im using to make most of the body panels from, nice and light but i may change the panels at a later date to carbon.

During the week i made up the rear firewall and side panels during my lunch breaks.
Got the rear firewall fitted first.

Then the right side.

Gromitted the hole for the wires to stop it rubbing on them, plus looks nicer...........

and left side fitted, along with tax disc holder............although thats a long way off, also added a small ToyotaGT sticker i had lying about ![]()


and here is a picture of the buggy next to her big sister, my Lexus

Spent a bit of time getting alot of the nuts and bolts covered with rubber covers as well to make the IVA go a bit smoother.
Im still unsure where i will be moving the battery to as im not certain where is the best place for it yet???
What do people think so far???
Jason
**** Little Update **** March 29, 2009
Not really worth doing an update really as i haven't done much but want to keep them regular so i can see how it all came together and keeps me motivated in continuing to build the buggy. Did get a few stickers on the car though

Also got the front calipers removed from the car as im going to clean them up, replace the bolts/bleed screws and paint them.
Weather was pretty gloomy saturday so didn't get the buggy out of the garage all weekend. The funds are really tight at the moment so can't really do much till i get paid and im also running out of stuff i can do while its here.
Easter weekend the buggy is getting moved to my work's workshop where i have LOOOOOOOOAAAAAAADDDDDDSSSSSSS of indoor room to work on the car as i please. This also means i can get on with welding and test fitting the front mount radiator.
I have limited myself to spend only £100 on parts during April and then the starlet work will start at the end of April.
Items i have on the list to buy next month are:
- Fiat Cinquenciento Rad £35
- Aluminium for rad pipes £20
- Steel for mounting Rad £5
- Master cylinders/brake components £25
- Powder coating powder £10
- Misc Parts £5
TOTAL: £100
Luckily my work recently invested in a powder coating machine so im going to be using that alot to coat alot of the parts so they don't corrode, what with the car sat under cover for about 5-6 months of the year!
Jobs for the following months before the car goes to ToyotaGT are:
- Weld up pedalbox
- sort out battery mounting
- Test fit/fit front mount Rad
- Make new side mirror mounts
- Rebuild front calipers
- Powdercoat/paint front end parts
Im really looking forward to getting this car up to ToyotaGT but need to do as much as i can myself as im trying to limit the spending on this car, what with saving for a house!
Jason
*** Small Update *** Date April 05, 2009
Haven't done anything this weekend as weather was so good and thought i would have a break from it all. Luckily becasue i don't have a date set for IVA i don't have to rush anything so everything can be done properly and i can take my time over it
Have been working on it during the week though, before and after work and during my lunch break. Aprils budget has been completely spent on the day i got paid and although i originally posted up a list of items i would be buying, this has since completely changed.
The front calipers where looking a bit tired so decided that this month i would be concentrating on these and working on the front end and getting everthing powdercoated/painted/rebuilt.
I toyed with the idea of buying alloy 4 pot front calipers but decided against it for several reasons, 1: they will provide too much power and will lock up way to easily 2: They are alot lighter, and although this seems like a good thing it will lighten the front even more and i need more weight at this end.
So i decided to rebuild the front mini calipers
They started off like this.....

Got a wirewheel kit and cleaned them up some what


Then Tuesday these arrived
New stainless steel caliper pistons, new seals all round, new bleed screws and new brake clevis's (£54 delivered, god i love mini prices
)

While i have them off the car now is the time to give them about 5 coats of Hammerite to stop them rusting up again, these are not finished but starting to get there!

I also ordered a new clutch master cylinder with built in reserviour bottle (£13 delivered) and got this test fitted to the pedal box


Also ordered the fiat reserviour bottle for the brake master cylinder, black hammerite paint, black powder coat and brake master cylinder seal kit.
Im welding up the pedal box during the week ahead and will be sorting out pedals etc next weekend.
Im working next weekend but have cut a deal with my boss, he is happy for me to work on the buggy the whole weekend and keep an eye on things to make sure they are working fine. If anything is broken then get it fixed and then back to the buggy
Will update again at end of next weekend
Jason
*** Update *** Date April 10, 2009
Going to be a busy weekend so as i have a few minutes free i wanted to update a few things now while i can.
Got the buggy moved this morning to its new home for the next 1-2 months while i work on a few parts till its off to have the engine fitted.
It was hit or miss if the rain would hold out this morning but it did so i shot out and got the buggy to my work's workshop while i had the chance. I now have loads of tools at my disposal that i didn't have before and are so usefull
Can work on it when i want now as i have keys to the building and they are open daily anyway. so evenings, weekends, lunch breaks etc
Here is a few of it in the workshop, you can see how much room i have.........

Got the pedal box welded up first, not the best weld i know but its my first ever bit of welding....this has improved dramatically!
I have been toying with the idea of removing the battery tray and moving it somewhere else but thought it made more sense keeping it at the front. I cut the front off and grinded it back and rewelded the front piece back on. I have a strap that will be used to hold it down in place. I would use a smaller battery but weight at the front is a good thing
Radiator will be mounted just in front of this, when i get a radiator anyway.
I then fitted the pedals to the box and have drilled the holes for the mastercylinders, im currently in the process of rebuilding the brake cylinder with new internals. This was then roughly placed and tacked in place and will be fully welded in place tomorrow.
Will update again later this weekend.
Jason
*** Small Update *** Date April 12, 2009
Well yesterday i went back to the workshop and managed to get a little more done as it wasn't too busy.
Firstly started with getting the pedalbox fully welded in, was a bit tricky but got it done in the end. A little messy but its in the correct position and will get cleaned up later when it goes up to toyotaGT next month.
As im keeping the battery right at the front of the car i can now fit the kill switch, this has been put in the passenger footwell.
and then finally to meet the IVA regs i have had to fit some spacers to the frame to space the mirrors out so they can actually be of any use. Just welded them up and drilled the holes, they will be sprayed up Tomorrow if i get the chance.
I have put a hole in the rollcage padding and slid it over the end mounting point. This covers up the end so will help out at IVA stage as its covering the so called 'sharpe edges'.

Frame is starting to look a bit messy with all these bare metal, primer parts but when the car is all done and i don't need to do any more welding etc then it will be sand blasted and resprayed.
I also had some great news from ToyotaGT, they had a few hours spare last week so they have already removed the engine form the starlet and are starting to look it over! I have been told that on first impressions its in great condition and they will soon be doing a compression test and inspecting it further. I think they are as excited as me about getting this on the road!
As always i will keep you all updated when i can.
Jason
*** Rims and Rubber *** Date May 03, 2009
Well as i have been working on the front end recently i decided to buy the wheels for the front so i can start looking at making the arch mounts. The existing ones i have are buggered so i need to get some new ones made.
Decided to get some slicks on the car for the moment for a few reasons, going to be doing some track days before the car is road legal and these are so much cheaper than the road tyres i will be using. Picked up 2 part worn michelin racing slicks from ebay for £40 delivered (bargain!!!!!!!). Toyo R888's are roughly £60 each but no point in buying them yet if the car is going to be sat about doing nothing!


Then friday the 2 front wheels turned up
Would have got a full set but im not 100% sure if i will be using the mini hubs on the front. The wheels i got are the Superlight deep dish 13x7 inch with -7 offset £140 for 2 wheels delivered
also got a set of chrome wheel nuts from the bay.




Have been trying to get my mate to fit the tyres but he has been too busy so haven't had a chance yet
But hopefully get them done soon and on the car.
Saturday i managed to get over to TGT and look at the engine, looks mint and im going up there next weekend to rip a few bits off the car and get them sand blasted/powdercoated/painted/polished etc.
What you guys think of the wheels???
Jason