l have sorted the valves for the suspension spheres by cutting the pipe of welding the aperture up, although that may have been hasty as l could have screwed a pressure gauge in to keep track of the pressure :
l have also made a start on the wiring, thinking of mounting the coil packs and the ecu up high behind the seat in a custom made box
l have also relocated the throttle body onto the top rather than the end of the inlet manifold
Andy
l have also made a start on the wiring, thinking of mounting the coil packs and the ecu up high behind the seat in a custom made box
l have also relocated the throttle body onto the top rather than the end of the inlet manifold
Andy